New York - Hawthorne Data Centers
Located 35 miles north of NYC in Westchester County, TierPoint's Hawthorne, NY data center and colocation facilities enable companies to increase business agility and improve IT performance.
High Performance
The state-of-the-art TierPoint facility spans two buildings (HWT, HW2) and shares a campus with Westchester County Medical Center and New York Medical College, one of the nation's largest health sciences colleges and a biotechnology incubator. The TierPoint Hawthorne data center facilities are part of our nationwide network of data centers with guaranteed exceptional performance and low latency connections.
Strategic Location
The fourth-largest U.S. state by population and the third-largest by economic output, New York headquarters 58 of the Fortune 500. New York state promotes businesses to locate data centers here with a sales tax exemption on equipment purchased for use in data centers. These secure TierPoint data center facilities enable businesses to reach 20 million people in the NYC area, which exceeds the gross metropolitan output of any U.S. state and most nations.
Facility Specifications - 11 Skyline Dr.
Space
- 46,000+ total square feet, 28,000+ square feet of raised floor space
- Cabinets and cages available
Reliability
- 2N A-side and B-side power distribution design
- Three redundant 1,000kW generators; two redundant 2,000 kW generators on-site with minimum 48 hours runtime
- 100% uptime SLA
Connectivity
- Carrier-class, carrier-neutral facility
- Multiple, diverse fiber access available
- Cloud on-ramps and fabrics
- DWDM connectivity to 60 Hudson and 111 8th
- See Connect Point for all carriers and product offerings
Security
- 24x7x365 electronic and on-site security qualified personnel
- Secure two-factor authentication including biometric systems
- CCTV surveillance, with a minimum 90 days of retention
Product Availability
- Managed services, including private cloud, disaster recovery, security, and colocation solutions
- 24x7 Remote Hands technical support
Compliance
- Audited under SOC 1 Type II, SOC 2 Type lI, SOC 2 + HITRUST, GLBA, HIPAA, PCI-DSS¹, and NIST SP 800-531 annually, is ISO 27001 certified², and ITAR and Data Privacy Framework³ registered.
- Data Center Colocation Services (NIST Moderate baseline)
- ISMS and data center colocation
- EU Standard Contractual Clause/DPA template available
Facility Specifications - 17 Skyline Dr.
Space
- 172,000+ total square feet, 28,000+ square feet of raised floor space
- Cabinets and cages available
Reliability
- 2N A-side and B-side power distribution design
- Two redundant 2,000kW generators with minimum 48 hours runtime
- 100% uptime SLA
Connectivity
- Carrier-class, carrier-neutral facility
- Multiple, diverse fiber access available
- Cloud on-ramps and fabrics
- DWDM connectivity to 60 Hudson and 111 8th
- See Connect Point for all carriers and product offerings
Security
- 24x7x365 electronic and on-site security qualified personnel
- Secure two-factor authentication including biometric systems
- CCTV surveillance, with a minimum 90 days of retention
Product Availability
- Managed services, including private cloud, disaster recovery, security, and colocation solutions
- 24x7 Remote Hands technical support
Compliance
- Audited under SOC 1 Type II, SOC 2 Type lI, SOC 2 + HITRUST, GLBA, HIPAA, PCI-DSS¹, and NIST SP 800-531 annually, is ISO 27001 certified², and ITAR and Data Privacy Framework³ registered.
- Data Center Colocation Services (NIST Moderate baseline)
- ISMS and data center colocation
- EU Standard Contractual Clause/DPA template available
Hawthorne (HWT, HW2)
Why TierPoint
A leading national provider of hybrid IT solutions, TierPoint helps organizations drive performance and manage risk. No U.S. provider comes close to matching TierPoint's unique combination of thousands of clients; more than 40 edge-capable data centers and 8 multitenant cloud pods coast to coast; and a comprehensive portfolio of cloud solutions, colocation, disaster recovery, security, and other managed IT services.
Our biggest challenges were compliance, travel for our IT staff, and the ownership trust factor in terms of moving our mission-critical infrastructure to an outside provider. In the end, it really came down to a matter of trust.
Rich Hawley
Director of IT Infrastructure Services
American Customer Care
Our Satisfied Customers
Related Content
Case Study: Touro Dental College Goes Digital
Infographic: Modern Data Center Infrastructure Must-Haves